LA – Preliminary Declaration for Excavation Distributaries of [1] POTHARAM RMC FROM 0.000 TO 1.100, [2] POTHARAM LMC MINOR 2 R FROM 0.000 TO 0.350 [3] POTHARAM RMC MINOR M1 L FROM 0.000 TO 0.900 [4] POTHARAM LMC FROM 0.250 TO 0.900 [5] POTHARAM LMC M
| Title | Description | Start Date | End Date | File |
|---|---|---|---|---|
| LA – Preliminary Declaration for Excavation Distributaries of [1] POTHARAM RMC FROM 0.000 TO 1.100, [2] POTHARAM LMC MINOR 2 R FROM 0.000 TO 0.350 [3] POTHARAM RMC MINOR M1 L FROM 0.000 TO 0.900 [4] POTHARAM LMC FROM 0.250 TO 0.900 [5] POTHARAM LMC M | LA – Preliminary Declaration for Excavation Distributaries of [1] POTHARAM RMC FROM 0.000 TO 1.100, [2] POTHARAM LMC MINOR 2 R FROM 0.000 TO 0.350 [3] POTHARAM RMC MINOR M1 L FROM 0.000 TO 0.900 [4] POTHARAM LMC FROM 0.250 TO 0.900 [5] POTHARAM LMC M 1 R FROM 0.000 ΤΟ 1.465 Under Syp Canal Networks Package-III total extent of Ac. 17.04 Gts of land in the limits of Potharam Village of Kodimial Mandal |
26/09/2026 | 27/11/2026 | View (3 MB) Potharam(V)Kodimial (M) tel (4 MB) |